Toronto Kipling Station Transit Hub | ?m | 2s | Metrolinx | SAI

The TTC is no longer driving the bus on the redevelopment of Islington Station following MiWay's move to Kipling, it's now Create TO in the driver's seat as the site was one of the City properties that were identified as being prime candidates for affordable housing construction. Here's a conceptual plan for the site:

View attachment 225771

That was created for a December, 2019 public open house. The plan is to have a plan sent to Council for approval in the third quarter of 2020.

If you want to know more, check out https://createto.ca/housingnow/housing/bloor-islington/

42
At first glance this looks like a very solid plan that they have here.

It's pretty unfortunate that office development didnt pan out here, but at this point it's time that the TTC got out of planning what happens at Islington because they've dragged their feet on the issue for far too long (even though Metrolinx and the City also deserve a share of the blame as well).

I agree with @crs1026 with the sidewalk setback issues; the city better damn well ensure there are adequate setbacks here. I'd also add that they should ensure that there is some kind of mini-pedestrian plaza on the southeast corner of the site that acts like a gateway and ties in nicely with the plaza at Islington-Bloor Place.

As for the Islington Bus Bays themselves, the TTC better be putting shovels on the ground there as soon as Mississauga buses relocate to Kipling because the terminal is literally a ticking time-bomb.

Looks like a reasonable plan. Not sure why there couldn't be highrise development on top of the bus terminal though.
As long as the TTC is involved, something like that will never happen in a million years. The only precedent for something like that have been with the bus bays at Davisville and York Mills.
 
As long as the TTC is involved, something like that will never happen in a million years. The only precedent for something like that have been with the bus bays at Davisville and York Mills.

Uhh, Wellesley Station? McCaul Loop? Eglinton bus garage? Sherbourne Station? They've had quite a few property redevelopments over the years where the TTC has kept access to the ground level for their own purposes.

And again, the former development at Islington falling through was not the fault of the TTC's, but with the prime tenant's - SNC Lavalin - financial difficulties.

Dan
 
And again, the former development at Islington falling through was not the fault of the TTC's, but with the prime tenant's - SNC Lavalin - financial difficulties.

Dan
SNC Lavalin demanded something like a 300 car parking garage at Islington Station for them to move there and the City said "no".

42
 
Uhh, Wellesley Station? McCaul Loop? Eglinton bus garage? Sherbourne Station? They've had quite a few property redevelopments over the years where the TTC has kept access to the ground level for their own purposes.

And again, the former development at Islington falling through was not the fault of the TTC's, but with the prime tenant's - SNC Lavalin - financial difficulties.

Dan
True enough Wellesley, Eglinton, and Sherbourne all slipped my mind somehow. My main point though, is that the TTC/city hasnt been doing a good job at leveraging their existing property for development to take place overtop.

There's no reason why stations like St.Geroge, Spadina, and others have seen no development overtop. Of course there would be certain engineering challenges of performing such a task, but it's still a feasible endeavor.
 
There's no reason why stations like St.Geroge, Spadina, and others have seen no development overtop. Of course there would be certain engineering challenges of performing such a task, but it's still a feasible endeavor.

There is absolutely a reason. Developers are always going to go for the cheapest option, and if there is other land available - think surface parking lots, for instance - they will use that first.

In time I suspect that we'll see all of the stations close to the core get redeveloped, as well as a couple of other key locations. But for some of those locations, it may be some time still before that happens. There is still property that is currently unbuilt upon to be used first.

Dan
 
Jan 22
Almost completed the tunnel from the Hub to TTC tunnel and the new access to the Kiss & Ride.
49441585218_281fd17a8c_b.jpg

49442286307_307986079d_b.jpg

49442057341_815aeb8020_b.jpg

49442057641_8b5feb77c6_b.jpg

49442057851_c0caa696b0_b.jpg

49441586638_bc97624811_b.jpg

49441587063_83624d0595_b.jpg

49442288172_cb487de212_b.jpg

49442059386_78298dc16b_b.jpg

49442288862_48b13fb026_b.jpg

49442059776_c08db29d63_b.jpg
 
Jan 30
Lot More up on my site at the end and near the front as well since it was 2 visit that day.
49510550766_ff6498bed2_b.jpg

49510779107_41580af992_b.jpg

49510778312_cd0e331b00_b.jpg

49510777277_b7d26cc711_b.jpg

49510548681_5ff0896167_b.jpg

49510776772_d15ed3fe46_b.jpg

49510035333_7ecd0ed25b_b.jpg

49510772802_139fde818f_b.jpg

49510771737_9aaf404893_b.jpg

49496903141_d9f3fc11f8_b.jpg

49496905446_84b8ddce53_b.jpg

49496413008_bc2488778e_b.jpg

49496911051_f420a5640f_b.jpg

49496415233_1e949cc2c2_b.jpg

49496416298_658dfb9ceb_b.jpg

49496399953_58978832c2_b.jpg
 
What's the estimated completion date?
Opening September 2020. All the land not part of the Hub will be come a new TTC parking lot.

Once the Hub tunnel is connected to TTC ones, back filling and grading will start in the spring for TTC lot along with the PPU
 
Do they plan on reusing the giant circular slab of concrete currently being held on site?
 
Do they plan on reusing the giant circular slab of concrete currently being held on site?
There been a number of plans for the new TTC parking lot with a new pickup/drop off next to the north Subway Cr stair & tunnel and else where. With the removal and relocation of the existing roof last year, they plan to rebuilt it with an elevator to the new Hub tunnel. Haven seen any new plans for the area and guessing that the old drive way will not be use as it will prevent accessibility riders gaining access to the surface accessibility station entrance. The original plan and could happen at the old area that a GO Station style pickup/drop waiting area will take place.

The whole lot area is to be level up to the north retaining wall with a ramp up to Dundas at Acorn intersection that will have traffic lights. The old Subway/Auckland intersection will still see traffic lights.

There isn't much work left for the Hub Tunnel to connect to the old TTC tunnel. Once that is finish along with the elevator shaft, back filling will take place with a new slab and support columns stub being pour once the frost is gone. As the grading of the area take place, it will gives us a better idea what is going to take place there. The columns on the roof will be most likely welded to the new sub columns.

The original plan call for buses using the new Hub to uses Subway Cr to/from it, but the 180 degree loop at the west end is saying no unless buses are going to do another 180 to get back to Subway Cr. Time will tell what is going to take place for both areas now.
 
March 15
They have stated work on the ramp to Dundas at Acorn, but wasn't able to get shots
49668082491_74aa1780b9_b.jpg

49668368097_ea927be65f_b.jpg

49668368642_3baed96e49_b.jpg

49668368907_135f12aec2_b.jpg

49667542538_d353217921_b.jpg

49668084056_9a9837410e_b.jpg

49667543083_2e34ca3d69_b.jpg
 

Back
Top