Toronto King Blue by Greenland | 155.75m | 48s | Greenland | Arcadis

First crane now being installed at King Blue. Two night time cell phone photos:

King Blue Crane-2.jpg



King Blue Crane -1.jpg
 

Attachments

  • King Blue Crane -1.jpg
    King Blue Crane -1.jpg
    719.6 KB · Views: 1,082
  • King Blue Crane-2.jpg
    King Blue Crane-2.jpg
    629.2 KB · Views: 1,060
From yesterday.

IMG_2654.JPG
IMG_2655.JPG
IMG_2651.JPG
 

Attachments

  • IMG_2654.JPG
    IMG_2654.JPG
    643.2 KB · Views: 656
  • IMG_2655.JPG
    IMG_2655.JPG
    648.1 KB · Views: 638
  • IMG_2651.JPG
    IMG_2651.JPG
    614.7 KB · Views: 672
Excavation of the ramp is now complete, and initial footings and foundation work in the former ramp area is now underway. Forming, rebar, and the steel anchoring frame for the crane base for the second crane are now in place, waiting on the concrete to be poured. Assuming no unusual delays, the next crane, in the south-east section of the site, should be up in a week or so.
 
All the excavation and footings are complete. They are working on the drains and stone for the floor slab. Workers told me yesterday they excavated the last of the footings and are working on the drains. It was a quick dig.
 

Back
Top