Toronto Karma Condos | 165.8m | 50s | Lifetime | a—A

More cladding and metal cladding up on the base.
IMG_7236.jpg
IMG_7237.jpg
IMG_7238.jpg
IMG_7239.jpg
IMG_7240.jpg
IMG_7241.jpg
 

Attachments

  • IMG_7236.jpg
    IMG_7236.jpg
    1.7 MB · Views: 2,578
  • IMG_7237.jpg
    IMG_7237.jpg
    1.4 MB · Views: 2,566
  • IMG_7238.jpg
    IMG_7238.jpg
    1.6 MB · Views: 2,553
  • IMG_7239.jpg
    IMG_7239.jpg
    1.5 MB · Views: 2,547
  • IMG_7240.jpg
    IMG_7240.jpg
    1.3 MB · Views: 2,529
  • IMG_7241.jpg
    IMG_7241.jpg
    1.5 MB · Views: 2,516
Has there been any information or discussion about a light feature inside the mechanical level?
 
Would have liked to see the mass on the eastern side shift/slide over in line with the cantilever on the western side. - but from a developers perspective, it would defeat the purpose of having the extra square footage brought over by the cantilever in the first place :( .
There way of incorporating this this is with the fritted cladding break which isn't quite the same.

Anyway

Today:

27540235680_cdc987afd8_b.jpg


27540235030_87540377c5_b.jpg


EDIT: One More

27766262231_695f8ef85f_c.jpg
 
Last edited:
Hopefully to be glassed-in?

42
 
From Friday.

IMG_0170.JPG
IMG_0167.JPG
IMG_0168.JPG
 

Attachments

  • IMG_0167.JPG
    IMG_0167.JPG
    294.9 KB · Views: 877
  • IMG_0170.JPG
    IMG_0170.JPG
    237.1 KB · Views: 854
  • IMG_0168.JPG
    IMG_0168.JPG
    281.5 KB · Views: 922

Back
Top