Tim MacDonald
Senior Member
December 1st-most of the flights I had planned for today were cancelled due to wind. I did manage a few shots.
Lots of new steel up at Port Credit station, glad to see!December 1st-most of the flights I had planned for today were cancelled due to wind. I did manage a few shots.
View attachment 616119
View attachment 616120
View attachment 616121
View attachment 616122
View attachment 616123
View attachment 616124
View attachment 616125
View attachment 616126
View attachment 616127
View attachment 616128
View attachment 616129
View attachment 616130
I love that burn out torched car with the LRT build in the background, cool shot.December 1st-most of the flights I had planned for today were cancelled due to wind. I did manage a few shots.
View attachment 616119
View attachment 616120
View attachment 616121
View attachment 616122
View attachment 616123
View attachment 616124
View attachment 616125
View attachment 616126
View attachment 616127
View attachment 616128
View attachment 616129
View attachment 616130
Cost is the big thing here. If we're looking more technically, there could be multiple utilities under the ROW that would need to be relocated again due to proximity to high voltage, and there may be codes that have to be followed, and those codes being followed would incur more cost. I.e. distance from house, distance from street, directional drilling, enclosures, location to adjacent utilities, and so on.Hydro infrastructure. The road and project is framed by a double row of high capacity hydro towers each carrying a multitude of high kWh wire. Not exactly a scene that Cezanne or Monet would portray. This topic has been touched on before, but outside of cost, are their technical reasons why this infrastructure cannot go underground? It is as ugly as any man made intervention on the public realm as you can find. And in a ‘city’ aspiring to be a city.
It’s probably worse in Brampton. I was in the Airport Road/ Williams Parkway area looking at buildings previously and the needle is firmly in the car culture zone, with a bit of a tremble when a ZUM bus zips by.
Looks like Guild has been going through and prepping all of the permanent traffic signals from what I've seen.
Around the 401 area, they seem to have two gantries off to the side with traffic signals mounted to them, hinting at a much more permanent solution for the traffic signals as opposed to having them strung from end to end. This is especially important if they are adopting priority signals along the line.
Interesting, I had no clue. I don't think I've seen black ones anywhere in Mississauga.It’s strange that despite Mississauga re-adopting black signal heads for their traffic signals, the ones being installed along Line 10 appear to be all-yellow.
It’s interesting that work around Brampton Gateway is so behind – there was so much time to make the minor change to move the stop back to the north side of Steeles as requested many times by Brampton (once they got a sensible council again) and even RioCan.
They'll have this open before the Eglinton Crosstown.Lots of new steel up at Port Credit station, glad to see!
The only black ones I have seen have been for bike paths. Is this a brand new thing? Not sure why you'd go for black. The yellow ones stand out, especially during the night if there is a power outage.