Mississauga Hurontario-Main Line 10 LRT | ?m | ?s | Metrolinx

They’ve been pouring a lot of these curbs between the LRT row and the street. From the looks of it, a car wouldn’t be able to just drive onto the ROW outside of intersections, correct?
Correct. Also, because the tracks aren't embedded in concrete up to top-of-track, cars would get stuck if they tried to cross the RoW.
 
They’ve been pouring a lot of these curbs between the LRT row and the street. From the looks of it, a car wouldn’t be able to just drive onto the ROW outside of intersections, correct?
They were using the curb machine to pour the road curb between Elm and Matthew Gates which is a few feet deep today. This setup the guideway to have the base form and pour so the tracks can be install on it and then pour in place.

There isn't any intersection where a vehicle drive off it onto the guideway without getting stuck within a foot or 2 of doing so.

There are sections where no curbs have been poured between the tracks
 
A few more pics showing some of the new curbs. Hard to tell which ones are new versus the other day but I got some slightly different views this time.

IMG_6509.jpeg
IMG_6510.jpeg
IMG_6511.jpeg
IMG_6512.jpeg
IMG_6513.jpeg
IMG_6514.jpeg
IMG_6515.jpeg
IMG_6516.jpeg
IMG_6517.jpeg
IMG_6518.jpeg
 