Transportation: The project will require the extension of the LRT tracks, Multi-Use Path, and relocation of the Steeles and Hurontario stop (Gateway Terminal stop) from the south side of Steeles and Hurontario to the north side, resulting in changes to the Regional intersection configuration. Regional staff are supportive of the City of Brampton’s plan to relocate the Gateway Terminal LRT stop from the south side of Steeles Avenue as currently planned by Metrolinx through the Hurontario LRT to the north side. According to traffic analysis, if the stop remains on the south side of Steeles Avenue, the number of pedestrians crossing is expected to increase substantially as a result of future growth and transfers from the LRT stop to the Brampton Gateway Terminal which is on the north side. This number is expected to increase if the LRT stop remains south of Steeles Avenue as a result of the Hurontario LRT Extension. Relocating the stop to the north side of Steeles would result in fewer conflict points, lowering the risk of vehicular collisions with vulnerable road users.