Toronto home: Power and Adelaide | 78.33m | 22s | Great Gulf | Core Architects

I asked this question in the other thread. It seems impossible for me that they will be able to operate, given that their loading dock is in a building that will be torn down. I hope they can make it work, though.
 
Dusk shot from tonight

A4BA27CE-3B8B-4E9F-B725-EFB24A175A04.jpeg
 
For something with such a large floorplate, they sure succeeded in breaking it up using different techniques. All things considered, this one is turning out better than expected. It must be because Graziani + Corazza has nothing to do with this project.
 

Back
Top