Toronto GO Transit: Davenport Diamond Grade Separation | ?m | ?s | Metrolinx

South to north this evening. Lots of progress:

A4140971-13D3-4958-8EB2-EE871919934A.jpeg
2146F4DD-E370-41CE-A1D8-F3BD2E261432.jpeg
8DCD85E4-FEC2-4F54-BE03-FED7A42E73E9.jpeg
DA9210AB-FB96-415E-9DD3-FC1F60689FD9.jpeg
58FD183C-D291-4398-8ABF-D3ECC75ADD23.jpeg
43FDEDCE-567F-40D1-A45F-B33271A77F65.jpeg
E0CAE466-AB62-4CEE-831C-77A9B4FA2B0D.jpeg
1A70B72D-4A1A-401E-B9EA-AE9A93420538.jpeg
0A96E683-8075-40F0-9F90-5C54F0233020.jpeg
DFE67C8A-19A4-402B-AF83-020CFF1BF561.jpeg
4C2F2583-E7F7-49C2-B06B-3BB1EAF1A758.jpeg
A3DF004F-F8B6-4419-9B11-14542BA76DF2.jpeg
3FE64EE4-C217-4200-A975-114DBFAD8E34.jpeg
544C513E-38BE-455E-AE9A-08B86A7EEEC6.jpeg
1E66EB25-90E9-4806-87F1-B979394B5337.jpeg
 
If things go according to plan is the gameplan to have trains running on the diversion track by the end of the year or are we looking into 2021 for that to occur?
 

Back
Top