Toronto Eight Cumberland | 170m | 51s | Great Gulf | a—A

It'd be pretty strange to pay two men $60/hr to install perforated panels from a swingstage when they could've been installed by some kid making $18/hr in the factory...
 
Today.
75854294-32C0-417E-8D26-C65D7A275EC5.jpeg
71424856-BE43-48C2-BAA7-FE6671ED5094.jpeg
 
When is the new estimated occupancy for this building? It's massively delayed. I thought estimated completion was 2021 or 2022, but looks half finished.
 
great gulf is either really good (one bloor, monde, the clair if they ever build it) or very bad (power and adelaide, 357 king, yonge and rich)
 

Back
Top