They say that because it's all-underground but it's not heavy railWell the crosstown west extension is listed as a subway on the metrolinx website...
They say that because it's all-underground but it's not heavy railWell the crosstown west extension is listed as a subway on the metrolinx website...
They say that because it's all-underground but it's not heavy rail
Pathetic to be 5 YEARS behind schedule and still this wishy washy on getting it running
live stream of it
edit:
Notes
-all stations have occupancy permits
-training resumed mar 17
-software patch was just applied in the signalling system
-TTC have not started verifications; will happen after the end of driver training; estimated to take... no idea short of a 30 day trail run phase
-train frequencies and volumes have not been ramped up yet.
-NO DATE YET until TTC completes their verifications but still aiming for this year....
I am getting sick of the Ford government being like "this isn't our project, the liberals started it, its their fault" etc etc. Yeah ok, here was your opportunity to take charge and fix things, and all you do is blame the past administration.Pathetic to be 5 YEARS behind schedule and still this wishy washy on getting it running
Be reasonable, they've only had 7 years in government. Give them some time.I am getting sick of the Ford government being like "this isn't our project, the liberals started it, its their fault" etc etc. Yeah ok, here was your opportunity to take charge and fix things, and all you do is blame the past administration.
Be reasonable, they've only had 7 years in government. Give them some time.
They have no rights to blame them when they copied their procurement and construction process.I am getting sick of the Ford government being like "this isn't our project, the liberals started it, its their fault" etc etc. Yeah ok, here was your opportunity to take charge and fix things, and all you do is blame the past administration.
TTC tunnelled the Spadina extension first, and then dug down, and removed the tunnel segments.TTC subway never took this long as they tunnel and excavate at the same time.
The TYSSE had all stations excavated during tunneling as either launch or excavation shafts. There were 4 TBMs that went from one station to another and relocated to start another journey. The tunneling between each station only took around 9 months and by the time they were done tunneling in 2.5 years, it would take roughly another 3 years to build the station from the hole upwards. The roughly takes 5-7 years to build the extension.TTC tunnelled the Spadina extension first, and then dug down, and removed the tunnel segments.
The big issue is how many years after the tunnelling contracts were first issued, to the station contract being issued (4? 5?).
Doors stuck open?I wonder if some of them will be open for Doors Open Toronto?
Now that the stations contracts are signed for the SSE, I'm hoping they can start digging at Scarborough centre shortly, and if they start digging at Lawrence East there is plenty of time to spare.They have no rights to blame them when they copied their procurement and construction process.
This tunnel first and excavate the station later plan is designed to be a decade long. TTC subway never took this long as they tunnel and excavate at the same time. Now just watch the Scarborough subway extension become their failure.
This cheap tunneling idea is claimed to reduce disruption during tunneling but extends the duration of disruption when evacuation takes so long. They should really go back to the old way and just buy 3 TBMs for Scarborough. Once tunneling is done they would have converted the launch shaft into a station. The digging would have been done always.
I just chimed into that thread too but they also took these signs down at the Mount Dennis station earlier this week for some reason. I will try get some pics the next time I walk by.
Man, I'm annoyed by this inconsistency!Just following up on this...it looks like new signage has been installed at Mount Dennis...the only changes I can note from the original signs are the GO and UP logos beside the train image