Toronto Eaton Centre (Ongoing Renewal) | ?m | ?s | Cadillac Fairview | Zeidler

Oct 27
More up on site
38003729451_15100132a7_b.jpg

24152016938_a87f73dfaf_b.jpg

24151961858_9741028fca_b.jpg

24151963008_df57d16795_b.jpg

38003690171_e55f61d75a_b.jpg

38003691251_5fecda40fc_b.jpg

38003692711_c1e84396cd_b.jpg

24151969478_dac7a7db97_b.jpg

26227549369_1533f51722_b.jpg

38003696611_90463f9510_b.jpg

24151973988_526e99a37c_b.jpg

26227553099_435909ed4e_b.jpg
 
If they are planning on opening the walkway up on Nov 2, what is the plan to enclose it at Hudson Bay??

Not only the last panel has to be fix, but the gap between the bridge and the store, unless I am missing something that doesn't show up in my photos.

Then that pole for TTC needs to be replace as well the brace from the building as it look like crap.

Having real plants and flowers in the mall goes a long way and saids something about the mall and owner.
 
Wow looks amazing from the Hudson's Bay side. Also I have a feeling Hudson's Bay's name comes first on the sign for political reasons (at the cost of wayfinding).
 

Back
Top