Toronto Crosstown LRT | ?m | ?s | Metrolinx | Arcadis

So with the instillation of overhead wires from Brentcliff to Kennedy and potential train testing by the end of the month, my 2 questions are:
1. How are they going to get the test train over there? As for as I know they've only brought trains a few stations away from Mount Dennis.
2. If they instead transport a train to the east end just for testing, where will they keep it? Maybe at Kennedy or Science Centre so its inside?
 
So with the instillation of overhead wires from Brentcliff to Kennedy and potential train testing by the end of the month, my 2 questions are:
1. How are they going to get the test train over there? As for as I know they've only brought trains a few stations away from Mount Dennis.
2. If they instead transport a train to the east end just for testing, where will they keep it? Maybe at Kennedy or Science Centre so its inside?

Kennedy is nowhere near complete enough to "safely" store a train inside. Yes it is a cavern but I don't think it is powered yet nor do I think Metrolinx wants vehicles parked in a construction site for any length of time
 
April 11
Finally got to these 85 photo that are up on site now as well seeing which few I could post here for the 3 locations I shot that day. As you can see the OS was 99% to 100% in place.

Portal to Don Mills
51129634126_8be46970c1_b.jpg

51129843848_81b96eab9a_b.jpg

51129688274_ef79ae3c56_b.jpg

51129631791_ee9801174f_b.jpg

51130743045_ca97ac3333_b.jpg

51129685849_b305538398_b.jpg

51129627811_2eec86aa3e_b.jpg


Sunnybrook Park Station
51129843238_291b0e7b78_b.jpg

51129629116_0ba13c131b_b.jpg

51129630911_c41a59a451_b.jpg

51129684044_0a56e801d5_b.jpg

51129629906_81da8edea8_b.jpg

51129685094_c9b7ebac23_b.jpg

51130742395_063a6b7bca_b.jpg


Sloane Station
51129627561_a64b85f197_b.jpg

51129682229_a8d0bf484b_b.jpg

51129667587_2c0f5468c9_b.jpg

51129667422_2629886ebe_b.jpg

51129681814_fbeb0841e1_b.jpg

51129627021_6d2fddfb9a_b.jpg

51129681459_b6750f3734_b.jpg

51129836363_8e9fcd8115_b.jpg

51129674757_07bac17584_b.jpg

51130746025_a6d2c87b2c_b.jpg
 
Are the station roofs translucent? If not would have been nice to see some solar panels on top
Based on what I have see, no is the answer to both things. All roofs should be green or solar panels or both. Most likely ML afraid that someone could cause damage to the panels or walking away with them.
 
Is this an emergency exit?
I would assume so as you are walking out into traffic and the only location I seen like this for any of the surface stations. I don't see a need for a crossing there as there is nothing around it to justify it. Both platforms are like this.
 
Does anyone know why Metrolinx has not released the virtual open house page for the below engagement session. Metrolinx stated "Virtual Open House pages will launch at 7 PM on the date specified; there will be no-real time audience engagement." Any insight would be appreciated.

Central - West
Cedarvale to Eglinton​
Wednesday April 21, 2021


 
Does anyone know why Metrolinx has not released the virtual open house page for the below engagement session. Metrolinx stated "Virtual Open House pages will launch at 7 PM on the date specified; there will be no-real time audience engagement." Any insight would be appreciated.

Central - West
Cedarvale to Eglinton​
Wednesday April 21, 2021


They forgot to update the home page but it's there.
 