tnarduzzi
Active Member
Just look at the state of the road markings. Markings are faded and in the wrong spot. Years out-of-date road markings aren’t being removed. Old and out-of-date road signs litter the streets and sidewalks.
It’s clear that Crosslinx does not give a damn about minimizing disruption
I know I’ve seen at least one accident on Eglinton that was caused by conflicting road markings
Yes the roads are beyond awful. At first I was willing to write it off as temporary construction related damage. But this project has now just dragged on forever, it’s gotten to the point where it has now been literally years of driving over the same potholes.
Case and point of the ineptitude:
I commute by vehicle on Eglinton daily passing both Leslie and Brentcliff. Going westbound there is a massive pothole about 6” deep on the hill going up toward Brentcliff. It is a sunken catch basin which has been there for months. It’s now deep enough to seriously damage cars going any faster then a slow creep. I’ve called this in to 311. 311 dispatched CoT Transportation Services staff. Transportation was forced to notify Metrolinx and close their work order because the city has temporarily ceded responsibility of Eglinton. Anybody want to take over/under bets on if Metrolonx fixes the catch basin before the entire Crosstown project is actually opened? I say over, the project opens first.
It looks like all problems with Eglinton ultimately get punted to the consortium. The contractor is clearly not going to go above and beyond at this point. I predict the City’s post Crosstown Eglinton beautification project ends up absorbing a bunch of repair overages for damages actually done by the Crosstown contractor.
Sorry to vent and derail this thread slightly but at this point I’m over it. This has been a disaster and despite having a background in planning and a great appreciation for transit I never ever want Metrolinx anywhere even remotely close to my home ever again!