M II A II R II K
Senior Member
Mississauga riders shouldn't have to pay extra if they connect to the LRT just to go to the airport.
Mississauga riders shouldn't have to pay extra if they connect to the LRT just to go to the airport.
Mississauga riders shouldn't have to pay extra if they connect to the LRT just to go to the airport.
They just have to stay on and use the MiWay 7 Airport bus, without transferring. See link.
Since they built the Mississauga TransitWay to use buses and not a light rail vehicle you'd think that the MiWay 7 Airport bus would use it, except that their 7 bus doesn't use the TransitWay.
The "busway" in Mississauga was by far the greatest waste of transit money ($185,000,000) the province has ever seen. It starts at "nowhere" and goes to "nowhere". You'd think it would deliver people to either the airport or a subway line in west Toronto but you'd be wrong. It deposits people in the middle of nowhere.
And it will be followed by the second greatest waste of transit money - an LRT from somewhere in Brampton to south Mississauga. Who needs this?. If you drive in this city in rush hour, people are trying to get from Peel (Mississauga and Brampton) to Toronto and vice-versa. nobody is trying to get to Brampton from Mississauga or vice-versa.
Why aren't we building and extension to the Bloor subway to Square One? Certainly it would immediately benefit far more people than an extension to Vaughn. Politics?
Grade-separated Eglinton to SQ1 was (is) the way to go, not B-D.
From SQ1, Eglinton connects to:
- Spur to YYZ and FWLRT (Humber College)
- GO RER (UP) to downtown.
- Future DRL West to downtown
- Barrie GO (redundancy to downtown)
- Spadina subway to downtown and York U.
- Yonge subway to downtown or north
- DRL East to Seneca College or downtown redundancy.
Grade-separated Eglinton to SQ1 was (is) the way to go, not B-D.
From SQ1, Eglinton connects to:
- Spur to YYZ and FWLRT (Humber College)
- GO RER (UP) to downtown.
- Future DRL West to downtown
- Barrie GO (redundancy to downtown)
- Spadina subway to downtown and York U.
- Yonge subway to downtown or north
- DRL East to Seneca College or downtown redundancy.
And it will be followed by the second greatest waste of transit money - an LRT from somewhere in Brampton to south Mississauga. Who needs this?. If you drive in this city in rush hour, people are trying to get from Peel (Mississauga and Brampton) to Toronto and vice-versa. nobody is trying to get to Brampton from Mississauga or vice-versa.
And it will be followed by the second greatest waste of transit money - an LRT from somewhere in Brampton to south Mississauga. Who needs this?. If you drive in this city in rush hour, people are trying to get from Peel (Mississauga and Brampton) to Toronto and vice-versa. nobody is trying to get to Brampton from Mississauga or vice-versa.
Why aren't we building and extension to the Bloor subway to Square One? Certainly it would immediately benefit far more people than an extension to Vaughn. Politics?
Service would be sq1 to Pearson alternating with sq1 to Toronto.That's an interesting viewpoint. But:
a) Will it be fast enough to attract a lot of riders? Square One to Mt Dennis is about 14 km, at 30 kph that's 28 min. A trip from Square One to Union via Eglinton LRT plus RER will take about 50 min when the transfer time is taken into account. If the source and/or destination is not within walking distance from those points, the trip time will exceed 1 hour.
BD extension isn't much better in that respect, a slow milk-run from Square One to Bloor & Dundas. Only direct RER service between the Toronto and Mississauga downtowns would be truly fast.
b) If the Eglinton LRT extension is popular in Mississauga, then will the Etobicoke section have enough track capacity to handle the demand? Will the line have to be quad-tracked from Mt Dennis to Renforth Drive (where the Pearson service branches off)?
Service would be sq1 to Pearson alternating with sq1 to Toronto.
Yus is OK (barely) with 2 tracks - eglinton doest need more. B-D is similar travel time, but more costly ( harder to elevate).
Agree, some type of GO is needed for express.