Islington Express Bus
Active Member
Wrong thread. Post that in the Eglinton West thread!
Thank you for updating us on the progress, though. Good to see it!
Thank you for updating us on the progress, though. Good to see it!
Once completed, the extension will be married with the Crosstown LRT and be one, for better or worse.Wrong thread. Post that in the Eglinton West thread!
Thank you for updating us on the progress, though. Good to see it!
This can still be done if being at grade is an actual issue.I am not saying that they should have built the entire line in one go. They could have built the at grade portion underground 10 years later.
I doubt they will redo this portion that soon. Redoing it means they are admitting their mistake and that will be even more embarrassing for them.This can still be done if being at grade is an actual issue.
Make it part of the maintenance tender in ~2040.
It's not a mistake to not have spent $2 Billion to put it underground like Ford wanted to, just not worthwhile for the small savings in travel time,. A few major intersections would've been worthwhile, Leslie would've been done if not for politics, and Victoria Park would have been worthwhile as well.I doubt they will redo this portion that soon. Redoing it means they are admitting their mistake and that will be even more embarrassing for them.
We'll find out once the line enters commercial service.It's not a mistake to not have spent $2 Billion to put it underground like Ford wanted to, just not worthwhile for the small savings in travel time,. A few major intersections would've been worthwhile, Leslie would've been done if not for politics, and Victoria Park would have been worthwhile as well.
It would not be just travel time savings if it was put underground (or elevated). The entire line would be grade-separated with no in-median/street-running, so theoretically, they could redesign it to run high-floor metro trains.It's not a mistake to not have spent $2 Billion to put it underground like Ford wanted to, just not worthwhile for the small savings in travel time,. A few major intersections would've been worthwhile, Leslie would've been done if not for politics, and Victoria Park would have been worthwhile as well.
If it had been foreseen that a premier would come along that decided to tunnel the western section under a wide open surface corridor, then sure it would have been worthwhile from the beginning to design a high-floor line with elevated outer sections. But we're not psychic.It would not be just travel time savings if it was put underground (or elevated). The entire line would be grade-separated with no in-median/street-running, so theoretically, they could redesign it to run high-floor metro trains.
Headwall construction have moved east to Islingon and Royal York station bring parts of Eglinton there into single lane. People would just avoid Eglinton all together.Back in 2016, Eglinton Avenue West & Martin Grove Road was rated the most congested intersection. See link.
Thanks to all the construction notices, construction signs, and especially Waze, drivers should be avoiding Eglinton & Martin Grove. For now.
Likely, once all the construction is over and done with, the drivers will return. It is because of the anticipated traffic congestion (mostly single-occupant motorists not going or returning from Pearson Airport) that they decided to put the LRT underground through the Eglinton, Martin Grove, 427, and 401 intersection.
This line will always operate as an LRT as that's what it's been designed for from the outset. Asides from the vehicles which will change once the current LRVs reach the end of their life, the line itself wont be replaced in anyway. Ontario Line trains will be high floor models, while Crosstown line vehicles will always be a low-floor design.Apologies if this has been asked.
Has Metrolinx or any other team specified whether this will remain an LRT line in 40-50 years? I'm curious if something like the trains we're going to see on the Ontario Line would be able to be used here if demand required it.
Thanks!
What about creating an elevated segment from Don Mills... similar to the elevated portion of OL.This line will always operate as an LRT as that's what it's been designed for from the outset. Asides from the vehicles which will change once the current LRVs reach the end of their life, the line itself wont be replaced in anyway. Ontario Line trains will be high floor models, while Crosstown line vehicles will always be a low-floor design.