Toronto CIBC SQUARE | 241.39m | 50s | Hines | WilkinsonEyre

  • Thread starter Suicidal Gingerbread Man
  • Start date
April 27

D2179C36-F06F-44FF-8985-68F164A53293.jpeg
 
Tuesday Pic's

They've been erecting steel posts and beams in the southwest corner of the site which will eventually be a retail store. The area has been used as a storage space for deliveries. Lately, the cranes have been lifting steel directly from the trucks as they arrive and delivering it to the top floors

183767


The final section of the north train crash wall is being formed

183768


Presently they are pouring along the eastern perimeter wall which is almost complete

183769
 