Kitsune
Senior Member
It's probably ASL height.
Yeah that seems likely ... although the site ground is about 77 meters above sea level, so I would assume something was not added right.
It's probably ASL height.
It's probably ASL height.
Yeah that seems likely ... although the site ground is about 77 meters above sea level, so I would assume something was not added right.
Aah. I witnessed the truss being transported along Front Street yesterday as I enjoyed the sun in Berczy Park. Wondered where it was going. Now I know. Thanks muchly!Woke up this morning with a big erection!
The first at track level steel supports appeared this morning. At the right centre of the picture on a flatbed truck, there appears to be a steel truss waiting for it historical placement.
View attachment 142206
Right on time @Michael62
Any chance that's temporary? I guess you'd only see it if you were on a train but I can't imagine the cross-bracing would be that thin.
or probably from an engineering and safety perspective either (and why would you care, the supporting structure will be virtually invisible.)What would be impressive is if the park over the rail corridor was only supported at the two ends with no support pillars in the middle. Too bad that’s not economically possible.