KhalilHeron
Active Member
I don't think these are on here anywhere
I don't think these are on here anywhere
View attachment 416592
View attachment 416593
View attachment 416594
View attachment 416595
https://www.ttc.ca/about-the-ttc/pr...cts/Bloor-Yonge-Station-Capacity-ImprovementsFrom whence did you fetch these?
IF they're newer than the old ones, it means they actually listened to some things I said (specific enough to see my finger prints)
I suggested this ceiling style, I did not suggest the undulation in it mind you!
I also suggested toning down the garish colours in the initial renders; though I didn't mean to have them just make it all white.
Well, changing the OBC!
Not a huge fan of the curvy ceiling slats - it felt unoriginal and gratuitous (frankly it looks like knockoff Calatrava). DO like the attempt to opening up the ceiling to reduce increase the feel of the ceiling height though.
All that white will be a challenge to keeping clean - anything less than perfect will look shabby.
I understand there is no funding for it but seeing renderings of this project without platform screen doors will always be a bit of a letdown, in my opinion.
Not a huge fan of the curvy ceiling slats - it felt unoriginal and gratuitous (frankly it looks like knockoff Calatrava).
I agree. I don't like the bland & copy-cat feel of the ceiling. The overall aesthetic is boring and feels like it could be anywhere.My suggestion took inspiration from Union (subway) station;
I'm sure they could come up with a reason, like wanting to wait until they get new trains on Line 2, or deciding to lengthen the TR trains, In each case the doors might not line up.Yes, with ATC, I don't see any reason why we would be undertaking and major station reconstruction without PSD.
I'm sure they could come up with a reason, like wanting to wait until they get new trains on Line 2, or deciding to lengthen the TR trains, In each case the doors might not line up.
The best argument is Bloor/Yonge is a terrible place to run an experiment where failure impacts service. The first PSD installation should be something like Highway 407 station as bypassing it impacts few customers.
Until six months after the reno is complete, several of the fins will be removed for water leak remediation in random locations around the station and it'll look that way for at least two-three years until they get replaced and different fins get taken out leaving a gap-tooth ceiling. That's the normal Toronto subway aesthetic.If they are going to use curving ceiling slats, it should done with purpose - to visually guide riders (platforms-escalators-exits). Done well it might even be more effective than signage.
AoD