whatever
Senior Member
If they didn't level it off it would be much more difficult to do shoring and piles
The forms for the fourth level are visible from the Yonge and Dundas area. Not too much longer and we'll be able to grab legitimate shots of the tower with the LED and Advertising madness in the foreground.
I meant to say the construction forms will be visible from Yonge-Dundas, and construction shots of the building as it rises can be accompanied by the LED-Advertising madness of Yonge-Dundas Square in the forground as the unfinished Aura tower's concrete frame and forming materials rise in the background.
I thought there was retail along both Gerrard and Yonge?Really? I didn't think there was any LED displays on this bldg? (Not as per the render anyway).
Anyone else slightly concerned that the retail faces Gerrard and not Yonge?
Anyone else slightly concerned that the retail faces Gerrard and not Yonge?
Anyone else slightly concerned that the retail faces Gerrard and not Yonge?
There's no retail on Yonge? Your kidding right?
He clearly didn't say that there was no retail on Yonge. He's talking about AURA.
I'm not sure if this is the grund floor or the first underground floor: http://www.retailataura.com//pdf/p1 plan Apr 26.10.pdf