So, here we go up to the top, behind the safety of the RCS, the Rail Climbing System” by Peri.
We come out under the forms for the floor above.
The forms are held up by Multiprop Shores by Peri, which can be set to the desired height..
We've now got a look at the cranes rising out of the floor below.
Shores holding up the Peri Skydeck forms:
Assembling forms:
Another look at the cranes:
A lot goes in to the floors:
"Chairs" will support the rebar within the floorplate:
Here's the top of the concrete pumping system, with an extendible arm:
It all looks like this up top:
A little closer to the elevator core:
Work goes on to extend the elevator core:
42