Red Mars
Senior Member
Mar 13, 2024
March 18. First image is the pre-construction rendering from the 88 Bathurst database file, based on the architectural design. The second and third images are photos from today - showing the reality currently under construction, of the rooftop area after the mechanical engineering design and specifications for the building were done, and the rooftop mechanical support systems were added.
View attachment 549359
View attachment 549361
View attachment 549360