Toronto 88 Bathurst | 68.3m | 17s | Hines | 3XN

Mar 13, 2024

q00FNHo.jpg
 
March 18. First image is the pre-construction rendering from the 88 Bathurst database file, based on the architectural design. The second and third images are photos from today - showing the reality currently under construction, of the rooftop area after the mechanical engineering design and specifications for the building were done, and the rooftop mechanical support systems were added.

1710801086886.png


1000003831.jpg


20240318_143507.jpg
 
March 18. First image is the pre-construction rendering from the 88 Bathurst database file, based on the architectural design. The second and third images are photos from today - showing the reality currently under construction, of the rooftop area after the mechanical engineering design and specifications for the building were done, and the rooftop mechanical support systems were added.

View attachment 549359

View attachment 549361

View attachment 549360

Another view of the additional rooftop components not represented in the initial renderings:

1711035065791.png
 
So far nothing is really looking like the render. I guess we shall wait and hope for the best. The final result will sure be very different from the render.
 
With the material palette here apparently tossed in the bin🗑️, sure looks like the cladding order for this was placed with the same supplier as 3XN's Aqualuna... too bad they didn't just go all the way with the same coppery balcony guards. Siblings.
 

Back
Top