Toronto 88 Bathurst | 68.3m | 17s | Hines | 3XN

Some kind of very leafy greenery going in on the terrace, it comes in a roll. In the back left you can see grasses have been planted in the planters that continue around to the other side.
IMG_1673.jpeg
 
November 11: Miscellaneous updates. Grills have now been installed (this morning) over the hole in the east side of the mechanical penthouse - looks much better. Excavation is underway for the Bathurst Street sidewalk along the south side of the project.

20241111_132404.jpg


20241111_122039.jpg


20241111_122108.jpg


20241111_132623.jpg


20241111_132548.jpg


20241111_132432.jpg


20241111_132645.jpg
 
Had a lot of hope this project would turn out great, but unfortunately it’s doing nothing for me at street level or above street level. Different cladding options could’ve saved it. It’s just looking like a giant slab with stile street presence.
 
November 22 - 7:40 AM - A whole lot of dry-walling going to be going on. On the plus side for the crew, it is indoors work, dry and reasonably warm given the current weather. On the minus side - all the DRY WALL DUST.

20241122_073514.jpg
 
Last edited:
December 10 - Main focus of the exterior work at 88 Bathurst has been installation of the remaining cladding, and preparation for the rebuilding of the Bathurst Street sidewalk. The external construction hoist is busy every day, so must be lots happening on the inside as well, but beyond camera range.

20241210_114418.jpg


20241210_114456.jpg
 

Back
Top