Revised Application
The updated Site Plan, dated June 2019, continues to propose 3 towers: Tower 1 is internal to the Subject Property with a height of 50 storeys, Tower 2 is planned at 56 storeys and is located along Steeles Avenue West, and Tower 3 is planned at 65 storeys and is located at the corner of Yonge Street and Steeles Avenue. A 7-storey podium is proposed along both Yonge Street and Steeles Avenue West and will connect Towers 2 and 3. The conceptual site plan proposes to incorporate the future TTC Steeles Avenue Subway station in the ground floor of the podium which can be accessed directly from Yonge Street and the proposed publicly accessible courtyard.
A total of 1,902 residential units are proposed, which is increased from the initial proposal of 1,890 units. Townhouses are no longer proposed at the base of the podium.
The hotel space has been increased to 15,405 m2 GFA from 14,032 m2 intended to accommodate approximately 228 hotel rooms. To service the various uses, 1,230 parking spaces are proposed in 5 levels of underground parking.