Toronto 250 Lawrence West | 35.05m | 9s | Graywood | BDP Quadrangle

I drive by it a couple times a week. The ground floor columns are poured and mostly stripped, I'd imagine they'll be forming the second storey slab shortly
 
Second floor started.

DSC04884.JPG


DSC04885.JPG


DSC04886.JPG


DSC04887.JPG


DSC04889.JPG


 
Thanks very much for posting this recent photo. Would it be possible to take some others from the different sides of the building and post them? I am currently living in Edmonton and will be moving back to Toronto at the end of October. Thanks very much. Hanneke

I'm almost never in this part of town, but next time I am, I'll see what I can do.

Maybe when you're back in town in October you can take & share a few shots!
 
I'm almost never in this part of town, but next time I am, I'll see what I can do.

Maybe when you're back in town in October you can take & share a few shots!
Thanks very much for your reply. Yes, when I'm back in Toronto in the fall I will take some photos and share with the members.
 
I was at the site yesterday. Tried to talk to one of the contractors. Said he couldn't share anything with buyers. My occupancy is in November and he expresesed confidence that they would be ready by then. I am a little doubtful of that timing. Not sure if anyone else has an earlier occupancy and then can see if there are any further delays.
PXL_20230517_135800391.jpg
PXL_20230517_135732564.jpg
PXL_20230517_135822747.jpg
PXL_20230517_140109753.jpg
 

Back
Top