Being at the meeting, the Tim building needs to be part of this project to help to shift the building south for more space on Eglinton. This will still have 25+ meter space between the 2 buildings.
The space on Yonge St is too small and if more space is found on Eglinton, it will help this space. The people who were complaining about the lost of green space at RioCan site, use it or loose it and not using it lead to it disappearing.
The building for 155 Redpath sales office should be part of one of the 2 projects as well. Otherwise those 2 building will be out of place once the 2 builds go up.
As for parking, it should be lower not increase as call for. Height is fine with me as this will become mid rise in 40 years as taller buildings come on line.
More office space is need here as well.