Andy_in_Toronto
Active Member
Cobblestones are being laid on Front south of the Flatiron building. Interesting that to different colours are used.
Good to see progress but these are concrete pavers, not cobblestones. Similar to Berczy. Same will be on Wellington sidewalks.Cobblestones are being laid on Front south of the Flatiron building. Interesting that to different colours are used.
View attachment 420584
No longer for lease? 98 The Esplanade. New window covering.
Former theatre, gym, shelter.
View attachment 421186
I did see that but not sure it is actually true! The construction project IS still supposed to be fully done in October. Then the TTC needs to string the overhead from Yonge to King. Clearly this COULD be done by November 22 but it's the TTC so .....@DSC probably made note of this already; but via Steve Munro's post of the new TTC service summary, which includes service impacted by construction, the date given for the Wellington project to wrap is November '22
I couldn't find a thread for the Yonge-Church Corridor (i.e., Ward 13 - Toronto Centre) so I figured here might be a suitable place to mention a proposal for 15 Toronto Street https://goo.gl/maps/ZSbgbhighAZy8mCW9
"The development proposal for the Subject Site contemplates the removal of the existing 11-storey office building and the construction of a 53-storey mixed used development with 296 residential units. The total proposed gross floor area is 23,676 square metres, comprised of 19,096 square metres of residential space, 3,819 square metres of office space, and 761 square metres of retail space, resulting in a floor space index (FSI) of 45.4. A Site Plan Application (22 185153 STE 13 SA) has been submitted concurrently with the application."
Source: https://secure.toronto.ca/AIC/index.do?folderRsn=azLt9iEWlwkPs7d07KONqg==#detail0