Aplus23
Active Member
I can't imagine a single route diverting from Sheppard up Neilson to Malvern Centre, then returning back to Sheppard. That would add at least 10 minuntes to the trip between the Sheppard / MCowan subway station and the points east of Neilson. And then, a regular mixed-traffic all-stop bus that stays on Sheppard would be faster than the LRT.
Pretty sure that if the LRT operates on Sheppard, then Malvern Centre will be served by a branch. Definitely, there will be a branch that connects Malvern Centre to Sheppard / MCowan. I am not sure about other branch(es): Sheppard / MCowan to UTSC and Kennedy, or Malvern Centre to UTSC and Kennedy, or both of those.
This is definitely what was proposed.