DKsan
Active Member
I came across this in March, but never posted about it.
From link:
Link to the TESR.
Technically preferred alternative:
From link:
The second study will address the planning and corridor protection for a proposed transitway on the west side of Highway 427 from Highway 407 to Highway 7 and will follow the approved environmental planning process for Group “A†projects under the Class Environmental Assessment for Provincial Transportation Facilities (2000). Opportunities for public input will be provided throughout each study.
.....
A Transportation Environmental Study Report (TESR) has been prepared to document the study findings for the 427 Transitway from Highway 7 to Highway 407. The TESR is now available for a 30-day public review period, ending April 17, 2015.
Link to the TESR.
Technically preferred alternative: