Roads: Gardiner Expressway catch-all, incl. Hybrid Design (2015-onwards)

They've paved most of the work area since my last update.

View attachment 607597

View attachment 607598
View attachment 607599


They're also rebuilding the retaining wall for the ramp up to the elevated section being worked on.
View attachment 607596


Lamp post installation should start soon and that'll be it for this phase.
based on the photos I think this might just be a waterproofing layer on the concrete deck. Photo no. 3 especially makes it look like they are spreading a liquid membrane out over the surface. When they start paving we'll likely see the larger asphalt trucks and steam rollers.
 