News   Jul 17, 2024
 262     0 
News   Jul 16, 2024
 802     1 
News   Jul 16, 2024
 637     0 

RBC Centre (LEED Gold, CadFair, 41s, KPF/B+H/&Co.) COMPLETE

Well it's FLAP season so if RBC chooses to support the program we may not have an answer to this mystery until May
 
Yeah, the construction flood lamps on each floor are very bright from all angles. RBC is lit up like a christmas tree every night.
 
3375507637_05823f3d73_b.jpg
 
I walked by RBC last night, and I can confirm that the LEDs are not running up the entire height of the building. It was still only lit up to the 10th or so floor. It seems that they're really making us wait for the LEDs and gap closing, it's such a tease.
 
They've started filling in the gap in the roof. When I rode by at about 4:45 all
of the frames were in place (the ones that were temporarily positioned to one
side. And they had just started placing the fill-in panels.
 
It's not great quality, as the heat coming from the condo in front was blurring the image, but its better than nothing. You can see the frames in place.

rbc%20mar%2023%202009.jpg
 

Back
Top