dusk
Active Member
Studies will last 10 years? We can conduct studies and make many of these changes in 10 months. This city is genuinely doomed if we can't move MUCH FASTER.There's a lot of discussion in the King Transit Priority thread about citywide improvements to streetcar operations. I've created this thread to consolidate those discussions.
As it turns out, the City of Toronto and Toronto Transit Commission (TTC) are currently studying RapidTO, which is an initiative to enhance bus and streetcar transit across Toronto through implementation of priority measures. The following routes were proposed for prioritization in Phase 2 of the RapidTO plan (below).
Phase 3 will include a series of roadway-specific studies over the next decade (2022 to 2032). This presents a rare opportunity for us to rethink our streetcar operations.
A similar thread should probably be made for the RapidTO bus network.
View attachment 430995
Last edited: