Interesting.
Although I'd be leery if it took out trees on the east side.
42
Although I'd be leery if it took out trees on the east side.
42
Traffic should be two-way and only go up and down the East side of the Park. The West side should be ripped up south of Hoskin and the park should be blended into the U of T campus.
Whenever traffic islands have been made into peninsulas in the UK, it has been a huge success. Everyone freaks out about removing lanes of traffic before it happens, but afterwards everyone can't believe they didn't do it earlier.
Traffic should be two-way and only go up and down the East side of the Park. The West side should be ripped up south of Hoskin and the park should be blended into the U of T campus.
Whenever traffic islands have been made into peninsulas in the UK, it has been a huge success. Everyone freaks out about removing lanes of traffic before it happens, but afterwards everyone can't believe they didn't do it earlier.
Berczy Park is scheduled for a very major upgrade after Pan-Am Games and there are plans for a more minor 'fixin' up' of St James in 2016. There are major plans for Allan Gardens, Cawthra Square (Barbara Hall Park) was done last year, Corktown Common is new as are the waterfront parks and there are plans for sprucing up all the small parks in Corktown. Not too bad.This is great news. A much needed facelift to a very important city park. Does anyone know the timeline on when this will be done?
I wish Toronto would do this for many of the existing parks downtown and throughout the city. Some of the large parks like Hogh Park and Edwards Gardens needs an urbanized facelift and to support the growing population that uses them.
Something seems to be happening..
TenderCall number: 158-2017
Commodity: Construction Services, Landscape Construction
Description: Queen's Park, North, construction
All materials, equipment, labour and supervision required to complete Queen's Park North Park Improvements.
Questions about this Tender should be directed in writing to Mike Voelker, CSCMP. at e-mail mvoelke@toronto.ca. For more information, please refer to Section 2.3 Deadline for Questions. The last day for questions with respect to this tender is four (4) working days prior to closing.
Issue date: June 12, 2017Closing date: July 10, 2017
at 12:00 Noon
See: https://wx.toronto.ca/inter/pmmd/calls.nsf/0/1011898FE6B94B3B8525813D0068649D?OpenDocument