News   Oct 22, 2019
 1.1K     4 
News   Oct 22, 2019
 353     5 
News   Oct 22, 2019
 440     0 

PATH Network Expansion (various, various, various)

raptor

Senior Member
Member Bio
Joined
Apr 23, 2007
Messages
2,504
Reaction score
3,282
It's either the PATH bridge over simcoe or part of the bridge to the ACC from WPP
 
Last edited by a moderator:

Atlantis

Active Member
Member Bio
Joined
Sep 25, 2010
Messages
629
Reaction score
142
Location
Midtown
Was around the ACC yesterday and got these shots of the new PATH pillars up on the south side.

















These were from earlier in the week, shots of the North West Path portal.


 

raptor

Senior Member
Member Bio
Joined
Apr 23, 2007
Messages
2,504
Reaction score
3,282
In the last picture, it seems like they've started building a portal to the west of the new PATH entrance, as if it would lead to a tunnel under York st. Does anyone know where this tunnel would lead?
 

TOareaFan

Superstar
Member Bio
Joined
Jun 24, 2008
Messages
11,855
Reaction score
2,439
In the last picture, it seems like they've started building a portal to the west of the new PATH entrance, as if it would lead to a tunnel under York st. Does anyone know where this tunnel would lead?
I think it initially pops out of the ground in front of 1 University avenue then will eventually head up York Street.
 

AlvinofDiaspar

Moderator
Member Bio
Joined
Apr 22, 2007
Messages
26,110
Reaction score
13,079
Location
Toronto
Yes - Phase I is to the NW corner of Front and York - Phase II is up York to Wellington. I *think* both phases are now funded.

AoD
 

raptor

Senior Member
Member Bio
Joined
Apr 23, 2007
Messages
2,504
Reaction score
3,282
Yes - Phase I is to the NW corner of Front and York - Phase II is up York to Wellington. I *think* both phases are now funded.

AoD
Thanks but I actually meant something else. I looked up the PATH map, and turns out I was referring to the moat<>Citibank Place connection. Notice the grey steel pillars that will eventually become doors.
 

interchange42

Administrator
Staff member
Member Bio
Joined
Apr 23, 2007
Messages
22,440
Reaction score
17,420
Location
by the Humber
Thanks for finding that.

It begs the question whether or not the PATH extensions should all be in one thread or should each get their own thread like the Northwest PATH Expansion. We are rethinking the way threads are split up right now, BTW, and looking for ways to make it easier to navigate to them all. The Transportation & Infrastructure section is a poorly structured and congested mess in particular.

42
 

androiduk

Senior Member
Member Bio
Joined
Sep 3, 2008
Messages
6,779
Reaction score
972
Location
Yonge & Bloor
Application: Building Additions/Alterations Status: Not Started

Location: 222 BREMNER BLVD
TORONTO ON M5V 3L9

Ward 20: Trinity-Spadina

Application#: 14 172958 BLD 00 BA Accepted Date: Jun 12, 2014

Project: Multiple Use/Non Residential Interior Alterations

Description: Proposal for interior alterations to "The Path" level, which includes a new elevator and glazing, 2 new elevators in the north building, and minor alterations to the theatre in existing mixed use building - "Metro Toronto Convention Centre"
 

TOareaFan

Superstar
Member Bio
Joined
Jun 24, 2008
Messages
11,855
Reaction score
2,439
Thanks for finding that.

It begs the question whether or not the PATH extensions should all be in one thread or should each get their own thread like the Northwest PATH Expansion. We are rethinking the way threads are split up right now, BTW, and looking for ways to make it easier to navigate to them all. The Transportation & Infrastructure section is a poorly structured and congested mess in particular.

42
I spend more time in the T & I section than anywhere else and if I had a suggestion it would be a sub-folder system.

EG....into the forum the first thing you would see is GO Transit...click on that and there would be forums about various GO stuf....Muniicpal Transit systems ...ditto you would go in there and it would branch to TTC/MT/etc......I think it might also limit the number of times duplicate threads are set up.
 

Top