News   Nov 04, 2024
 386     4 
News   Nov 04, 2024
 539     0 
News   Nov 04, 2024
 483     0 

PATH Network Expansion (various, various, various)

There are bridge segments beings fabricated and stored near the silos off Queens Quay. Are these the PATH segments?
Bridge.jpg
 

Attachments

  • Bridge.jpg
    Bridge.jpg
    92.2 KB · Views: 1,445
It's either the PATH bridge over simcoe or part of the bridge to the ACC from WPP
 
Last edited by a moderator:
I suspect it's the latter.

42
 
Was around the ACC yesterday and got these shots of the new PATH pillars up on the south side.

14411377924_b4d69b9145_b.jpg


14225927720_29a88a3257_b.jpg


14411347834_b9ed269cc9_b.jpg


14411336454_40e4f3f10c_b.jpg


14411325474_47b02932ae_b.jpg


14225824939_6ed6f27025_b.jpg


14432626993_7767b62c3c_b.jpg


14225859350_21039f88bc_b.jpg


These were from earlier in the week, shots of the North West Path portal.
14225835518_5748654105_b.jpg


14225950990_8aff127f09_b.jpg
 
Not that I have found.

42
 
In the last picture, it seems like they've started building a portal to the west of the new PATH entrance, as if it would lead to a tunnel under York st. Does anyone know where this tunnel would lead?
 
In the last picture, it seems like they've started building a portal to the west of the new PATH entrance, as if it would lead to a tunnel under York st. Does anyone know where this tunnel would lead?

I think it initially pops out of the ground in front of 1 University avenue then will eventually head up York Street.
 
Yes - Phase I is to the NW corner of Front and York - Phase II is up York to Wellington. I *think* both phases are now funded.

AoD
 
Yes - Phase I is to the NW corner of Front and York - Phase II is up York to Wellington. I *think* both phases are now funded.

AoD

Thanks but I actually meant something else. I looked up the PATH map, and turns out I was referring to the moat<>Citibank Place connection. Notice the grey steel pillars that will eventually become doors.
 
The Citibank Place connection has been there for years. It's just been closed during reconstruction on the Union Station side.

42
 
Thanks for finding that.

It begs the question whether or not the PATH extensions should all be in one thread or should each get their own thread like the Northwest PATH Expansion. We are rethinking the way threads are split up right now, BTW, and looking for ways to make it easier to navigate to them all. The Transportation & Infrastructure section is a poorly structured and congested mess in particular.

42
 
Application: Building Additions/Alterations Status: Not Started

Location: 222 BREMNER BLVD
TORONTO ON M5V 3L9

Ward 20: Trinity-Spadina

Application#: 14 172958 BLD 00 BA Accepted Date: Jun 12, 2014

Project: Multiple Use/Non Residential Interior Alterations

Description: Proposal for interior alterations to "The Path" level, which includes a new elevator and glazing, 2 new elevators in the north building, and minor alterations to the theatre in existing mixed use building - "Metro Toronto Convention Centre"
 
Thanks for finding that.

It begs the question whether or not the PATH extensions should all be in one thread or should each get their own thread like the Northwest PATH Expansion. We are rethinking the way threads are split up right now, BTW, and looking for ways to make it easier to navigate to them all. The Transportation & Infrastructure section is a poorly structured and congested mess in particular.

42

I spend more time in the T & I section than anywhere else and if I had a suggestion it would be a sub-folder system.

EG....into the forum the first thing you would see is GO Transit...click on that and there would be forums about various GO stuf....Muniicpal Transit systems ...ditto you would go in there and it would branch to TTC/MT/etc......I think it might also limit the number of times duplicate threads are set up.
 

Back
Top