    We don't seem to have a thread dedicated to PATH network expansion, not one that I can currently find in any case. If someone does have an idea of a thread that the following should be connected to, post a suggestion below…

    Neither do we have a thread regarding the Air Canada Centre which these images relate to specifically, again, not one which I can find at the moment, but…


    To prepare for the PATH +15 bridge connection to the Sun Life Financial Tower & Harbour Plaza Residences and to WaterPark Place to the south, there is now work under way at the Air Canada Centre to improve the the PATH connection there, or at least there appears to be.

    In the courtyard south of the Union Station south entrance…

    P1380623.

    there is work along the west wall of the Air Canada Centre that I assume has something to do with improving the 2nd storey PATH passageway's connection to ground level. Currently there are only stairs (behind unceremonious metal crash doors in the Air Canada Centre) that connect the two levels, and the PATH network is supposed to be accessible of course.

    P1380628.

    This looks like a pretty thin frame for a new elevator, but is that what this is for? And if it is, what happens when people arrive at ground level? Will there be a new ground level hallway built to make the connection, or will we have a weather-unprotected section? That doesn't make sense.

    P1380626.

    What's going to be happening here? Anyone have the inside scoop?

    42
     
    #1

  2. modernizt

    modernizt Senior Member

    Joined:
    Feb 8, 2014
    Messages:
    1,474
    Likes Received:
    993
    I wonder why they were so shortsighted about the PATH connection when they originally expanded the ACC. Now it just feels like they're tacking things onto it unceremoniously. Colour me unimpressed.
     
    #2
  3. TOareaFan

    TOareaFan Superstar

    Joined:
    Jun 24, 2008
    Messages:
    11,518
    Likes Received:
    2,138
    By "expanded the ACC" do you mean the project to extend the western lobby/entrance facing Maple Leaf Square?
     
    #3
  4. DtTO

    DtTO Active Member

    Joined:
    Oct 1, 2012
    Messages:
    827
    Likes Received:
    62
    Location:
    CityPlace
    It can't be an elevator since they've already capped it at the second floor. If it were an elevator, they would need additional room on top for the equipment. I also don't think that having an open section doesn't make sense.

    Out of curiosity, who pays for additions to already built sections like this one? If you ask me, I think that the city should be responsible for covering at least some of the cost to ensure consistency/quality. Considering the number of stores down there, I'm sure they make more than enough revenue through taxes. By retail area alone, the PATH is now larger than the West Edmonton Mall, and one of the top 10 largest malls in the world.
     
    #4
  5. Benito

    Benito Senior Member

    Joined:
    Mar 12, 2014
    Messages:
    4,086
    Likes Received:
    10,505
    Location:
    Yonge and Bloor
    It could be a hydraulic elevator and not need additional room on top for the mechanicals as with a hydraulic elevator the mechanicals would be underneath.
     
    #5
  6. Woodbridge_Heights

    Woodbridge_Heights Senior Member

    Joined:
    Feb 14, 2008
    Messages:
    2,421
    Likes Received:
    243
    Maybe they plan on enclosing the entire area below the walkway?
     
    #6
  7. innsertnamehere

    innsertnamehere Superstar

    Joined:
    Mar 8, 2010
    Messages:
    11,618
    Likes Received:
    4,901
    Location:
    Hipsterville
    The +15 bridge is designed to be moved and remain open when moved to allow for maintenance to the Gardiner. It will (I believe) normally be "docked" in the western section, but will be moved overnight to the eastern section every once and a while to allow for access to the underside of the Gardiner.
     
    #7
  8. whatever

    whatever Senior Member

    Joined:
    Nov 25, 2007
    Messages:
    2,503
    Likes Received:
    120
    Seriously? That amazes me that that was deemed the easiest solution to the problem of maintaining the underside of the Gardiner. I'd have assumed it would be easier to just stand on top of the bridge. Or is there no height clearance?
     
    #8
  9. innsertnamehere

    innsertnamehere Superstar

    Joined:
    Mar 8, 2010
    Messages:
    11,618
    Likes Received:
    4,901
    Location:
    Hipsterville
    no clearance, in order to give enough room for cars on Lakeshore the bridge essentially has to be right up against the underside of the Gardiner.
     
    #9
  10. uwaterloo2010

    uwaterloo2010 New Member

    Joined:
    Nov 30, 2012
    Messages:
    48
    Likes Received:
    17
    Possible construction of the new path walkway from the ACC to 1 York

    photo 1.
    photo 2.

    New entrance from the ACC
    photo 3.
    photo 4.
     
    Last edited: May 19, 2014
    #10
  11. interchange42

    interchange42 Administrator Staff Member

    Joined:
    Apr 23, 2007
    Messages:
    21,071
    Likes Received:
    13,706
    Location:
    by the Humber
    Not possible, but a confirmed sighting.

    42
     
    #11
  12. Mercator

    Mercator New Member

    Joined:
    Jun 2, 2013
    Messages:
    53
    Likes Received:
    7
    The hoarding on site now suggests that this will be the storefront for Real Sports which has closed down its store in the podium of 65 Bremner. Sportschek will be moving into their old location.
     
    #12
  13. W. K. Lis

    W. K. Lis Superstar

    Joined:
    Dec 24, 2007
    Messages:
    13,458
    Likes Received:
    2,689
    Location:
    Toronto, ON, CAN, Terra, Sol, Milky Way
    Already obsolete.



    [​IMG]

    Effective January, 2014.
     
    #13
  14. adHominem

    adHominem Senior Member

    Joined:
    Dec 8, 2009
    Messages:
    1,040
    Likes Received:
    588
    Location:
    Bloordale
    The Sports District continues apace.
     
    #14
  15. interchange42

    interchange42 Administrator Staff Member

    Joined:
    Apr 23, 2007
    Messages:
    21,071
    Likes Received:
    13,706
    Location:
    by the Humber
    Two PATH extensions of three currently under way:

    Doors for northwest PATH Extension under Front:
    P1390620.

    West connection from the Delta to the Skywalk:
    Garage entry to Delta on Lower Simcoe with coming PATH bridge above.
    GP1390618.

    Skywalk corner where the new connection will be made across Lower Simcoe.
    HP1390619.

    PATH bridge pillar coming here.
    IP1390601.