TossYourJacket
Senior Member
The tunnel under Dow's Lake is single tracked. While some parts of the line are being expanded to double tracking as part of this extension, the tunnel is not (due to lack of budget), which means the tunnel is now a huge choke point. As such. it was decided to keep consistent frequencies for the length of line 2, vs having trains show up every 20 minutes or so at either terminus beyond South Keys. It's not an ideal plan, that's for sure, but 2 separate lines means more frequency on both of them compared to interlining.What's the reason for not interlining lines 2 and 4?
Ideally, someday the tunnel will be improved to allow for double tracking and electrification, but that's not part of the Stage 2 expansion sadly.