News   Dec 04, 2024
 254     0 
News   Dec 04, 2024
 98     0 
News   Dec 04, 2024
 1K     2 

Orangeville-Brampton Railway (OBRY)

Yes. CP has always kept control of the first mile or so of the former Orangeville line. That includes customers in Mississauga. The CP-owned line ends north of Highway 401, near the old Derry Road alignment.
Is CP planning to shut down that part of the line?
 
According to Google Maps street view, the Porterfield Road and Queen Street East crossings of the OBRY, both located in Caledon, have been removed

Porterfield Road, May 2021
Screenshot_20230706-120607_Maps.jpg


Porterfield Road, May 2023
Screenshot_20230706-120618_Maps.jpg


Queen Street East, May 2021
Screenshot_20230706-121052_Maps.jpg
Screenshot_20230706-164544_Maps.jpg


Queen Street East, May 2023
Screenshot_20230706-121055_Maps.jpg

Screenshot_20230706-170412_Maps.jpg
 
The crossing signals have been removed from the OBRY crossings between Steels Avenue and English Street in Brampton. I don't know if any other crossings have had their signals removed, but I do know for sure that they have been removed between Steels Avenue and English Street.

Here are some pictures of the Chinguacousy Road crossing on July 16, 2023
20230716_204012.jpg
20230716_204134.jpg


And here are some pictures of Chinguacousy Road on August 5, 2023, after the signals were removed
20230805_162527.jpg

20230805_162818.jpg
 
Removing the Bovaird Drive crossing, August 31. About 50 metres of track on either side was removed as well.

The diamond at Downtown Brampton is still intact, complete with functioning signal protection lights for non-existent OBRY trains.

IMG_7133.JPG
IMG_7135.JPG
 

Attachments

  • IMG_7137.JPG
    IMG_7137.JPG
    292.5 KB · Views: 96

Back
Top