micheal_can
Senior Member
Jim Watson has said that he'd consider an extension of the Trillium Line into Gatineau as Stage "3B" with Kanata and Barrhaven being Stage "3A". Barrhaven is currently being studied, so I think it can be assumed Gatineau is next in the plans. And then eventually Carling, I guess (for LRT at least).
So, I am sort of right?