News   Dec 23, 2024
 1.2K     0 
News   Dec 20, 2024
 3.8K     11 
News   Dec 20, 2024
 1.3K     4 

miWay Transit

Staring May 23 to June 23, Central Parkway Intersection on Hurontario will see the guideway built across it with no left turns for Hurontario St.

Haven't seen signs on Central Parkway yet as to what is to happen on that road for left turns.

Based on the timeframe for work, this is a full closure that it will not only affect route 53, but buses going to/from CP to Kipling or routes. See no info on the site if a detour is in effect and if there is one, the 53 will use Elm to go south with normal routing. The only thing for 53 is the stop at the medical building on Hurontario is now at Fairview some 200m south.

The southbound 2 that has been using the medical stop while CP been out of service will be getting off/on 125m north of CP now.

A partials closure is usually 2 months.

Starting May 21 for at least 2 months, Square One Dr intersection on Hurontario will see the guideway built across both roads starting with Square One Dr. Southbound traffic is being swung to the west with a nice loop swing to/from Square One and may have some impact on southbound routes especially the 103. They are changing the left turn lane onto Square One for northbound and may have an impact on the 103 or be an improvement.
 
Last edited:
At last night's transit advisory committee meeting, staff provided a presentation outlining 2024 progress to date and proposed service improvements to be implemented in fall 2024 and beyond.

The full presentation deck is available here. I will summarize some of the key points and then add some of my own data obtained from MiWay.

As part of the 2024 budget, MiWay received 57,000 additional service hours. The majority of these hours have already been implemented, focused on revising schedules across the network for reliability (adding additional buses to maintain frequency) with some minor frequency improvements.

A second mid-year increase was approved, allowing for an additional 57,000 hours which will be more focused on restoring and improving service levels. These will be implemented in fall 2024 and the highlights are:

  • NEW route 126 Burnhamthorpe Express running between UTM and Kipling, running during weekday rush hours every 15 minutes
  • NEW route 50 running between Winston Churchill Station and Meadowvale TC serving Churchill Meadows and Lisgar; 90 Terragar-Copenhagen to be eliminated and 39 Britannia restructured to serve Meadowvale TC via Winston Churchill
  • Significant weekday and weekend frequency improvements on 7 Airport, 11 Westwood, 26 Burnhamthorpe, 35 Eglinton, 39 Britannia, 42 Derry, 61 Mavis among others
A similar significant addition of service hours is projected in 2025 with highlights including:

  • Revised Derry corridor service including connections to Finch LRT
  • Improved service on Dundas, Derry, Eglinton, Mavis and McLaughlin Corridors
  • Improved service levels on routes 38 Creditview, 39 Britannia, 107 Malton and 109 Meadowvale among others

Below I will add some of the data I have compiled that compares 2023 ridership to 2022, and also 2019. MiWay uses Automated Passenger Counter (APC) data and I have been able to obtain the data over the last 5 years. This is intended to be the first of a deeper dive into MiWay 2023 ridership. Some points to remember about the following data:

  • Figures are boardings (unlinked trips)
  • Data is from the fall 2023 board period (Late October-mid December) and comparing to the same periods in 2022 and 2019
  • My data shown is not averaged out for the full year or any variances, it is strictly the above points in time. Therefore, the data points such as percentages will vary vs what is in the MiWay presentation.

System Overview
Saturday and Sunday boardings continue to show significant growth in 2023.
Copy of System Overview.png



Weekday boardings per clock hour
Midday and Evening boardings continue to grow over 2022 and exceed 2019 (pre-covid) levels; however AM peak lags 2019 levels and PM peak just matches them.

Copy of Weekday Clock Hour.png



Saturday boardings per clock hour
Boardings exceed both 2022 and 2019 levels at all hours of the service day.

Satuday Clock Hour 500.png



Sunday boardings per clock hour
Boardings exceed both 2022 and 2019 levels at all hours of the service day.

Copy of Sunday Clock Hour.png



Closed doors (overcrowding) continue to be a significant issue with 2023 recording the highest levels on record and 2024 starting off with similar trends.

Copy of Closed Door Graphs.png



Weekday ridership by route, 2022-2023 comparison

2022-2023 1.jpg
2022-2023 2.jpg



Weekday ridership by route, 2019-2023 comparison

1 Copy of MiWay route boardings 2019-2023 - Weekday (2).jpg
2Copy of MiWay route boardings 2019-2023.jpg



Weekend ridership by route, 2022-2023 comparison

2022-2023 3.jpg
2022 2023 4.jpg



Weekend ridership by route, 2019-2023 comparison

3 Copy of MiWay route boardings 2019-2023 (1).jpg
4 Copy of MiWay route boardings 2019-2023 (1).jpg


Overall, while the investments in service are long overdue and welcome, many MiWay routes still operate at frequencies below what they were pre-covid even in the face of ridership growth. Reallocating buses to other routes and increasing runtimes (but not adding buses to balance) due to congestion are the main culprits. Even with the service improvements, many routes will continue at levels below pre-covid and also fall below established minimum standards. This is more evident when viewing weekday service, but is also a issue with weekend service as well.

MiWay Frequency Changes - Weekday.jpg


Note: The above images were embedded into the post directly to ensure they were legible. Please do not quote the entire post with images included when replying.
 
At last night's transit advisory committee meeting, staff provided a presentation outlining 2024 progress to date and proposed service improvements to be implemented in fall 2024 and beyond.

The full presentation deck is available here. I will summarize some of the key points and then add some of my own data obtained from MiWay.

As part of the 2024 budget, MiWay received 57,000 additional service hours. The majority of these hours have already been implemented, focused on revising schedules across the network for reliability (adding additional buses to maintain frequency) with some minor frequency improvements.

A second mid-year increase was approved, allowing for an additional 57,000 hours which will be more focused on restoring and improving service levels. These will be implemented in fall 2024 and the highlights are:

  • NEW route 126 Burnhamthorpe Express running between UTM and Kipling, running during weekday rush hours every 15 minutes
  • NEW route 50 running between Winston Churchill Station and Meadowvale TC serving Churchill Meadows and Lisgar; 90 Terragar-Copenhagen to be eliminated and 39 Britannia restructured to serve Meadowvale TC via Winston Churchill
  • Significant weekday and weekend frequency improvements on 7 Airport, 11 Westwood, 26 Burnhamthorpe, 35 Eglinton, 39 Britannia, 42 Derry, 61 Mavis among others
A similar significant addition of service hours is projected in 2025 with highlights including:

  • Revised Derry corridor service including connections to Finch LRT
  • Improved service on Dundas, Derry, Eglinton, Mavis and McLaughlin Corridors
  • Improved service levels on routes 38 Creditview, 39 Britannia, 107 Malton and 109 Meadowvale among others

Overall, while the investments in service are long overdue and welcome, many MiWay routes still operate at frequencies below what they were pre-covid even in the face of ridership growth. Reallocating buses to other routes and increasing runtimes (but not adding buses to balance) due to congestion are the main culprits. Even with the service improvements, many routes will continue at levels below pre-covid and also fall below established minimum standards. This is more evident when viewing weekday service, but is also a issue with weekend service as well.



Note: The above images were embedded into the post directly to ensure they were legible. Please do not quote the entire post with images included when replying.

Excellent post!

Let me add to it:


1717613331604.png

1717613378409.png


1717613461905.png

1717613515315.png

I'm with @MiExpress here.

This is a real, tangible improvement. Particularly for select main corridors, and especially in the off-peak/weekend time frame.

Good to see a note about improving 24-hour service as well.

****

Needs to be better though.

One more major service expansion of this scale (2024 and 2025 combined) in 2026 would probably bring most services to where they need to be.

They really do need to work on more precise/even headways and clock-face schedules for anything less frequent than 15M
 
I rode a Miway bus recently for the first time in a couple of months, and had to stand because of the ridiculous bar thing that does absolutely nothing except make people stand when they could be sitting.
https://urbantoronto.ca/forum/threads/miway-transit.6833/post-1941963
Have they ever explained where this came from, or why it's still there? Do we know for certain if this nonsense arose from some silly lawsuit (did Daffy Duck "slap 'em with a habeas corpuscle")? There's still no way it could make any sense. Wouldn't it be just as likely, maybe more likely, that some person might sue if they were standing and fell down if the bus had to stop suddenly?
 
Last edited:
I rode a Miway bus recently for the first time in a couple of months, and had to stand because of the ridiculous bar thing that does absolutely nothing except make people stand when they could be sitting.
https://urbantoronto.ca/forum/threads/miway-transit.6833/post-1941963
Have they ever explained where this came from, or why it's still there? Do we know for certain if this nonsense arose from some silly lawsuit (did Daffy Duck "slap 'em with a habeas corpuscle")? There's still no way it could make any sense. Wouldn't it be just as likely, maybe more likely, that some person might sue if they were standing and fell down if the bus had to stop suddenly?
My favor put down for the city as we are the only system in the world that I have ridden on to do this over a lawsuit.

The city figures this is the best option to save them from other lawsuits. By having more riders standing opens the door for lawsuits. I have no knowledge what happen in the first place or who caused it in the first place and pure dumb doing so.

The way some drivers drive, it surprising there haven't been more lawsuits to date.
 
I did a search to try to see if anything like this has ever been seriously recommended. To my surprise, it has.
https://www.transit.dot.gov/sites/fta.dot.gov/files/FTA_Report_No._0021.pdf
Crashworthiness Evaluation of Mass Transit Buses
...
• Standing passenger safety

- Side-facing seats are strongly recommended against, for the protection of both the seated passengers in them and standing passengers... Side-facing seats provide direct exposure to standing occupants from those occupying the seats and allow more space to build up impact speeds.

- Similarly, it is strongly recommended to remove rear center (aisle) seats, removing the danger to standing occupants from being struck by those seated in them during a crash.
I'm still skeptical of how valid this is in practical reality. The report is from 2012, and if side-facing seats are unsafe, the TTC and whoever builds their vehicles certainly seem to have ignored any such recommendation.
 
Last edited:
I did a search to try to see if anything like this has ever been seriously recommended. To my surprise, it has.
https://www.transit.dot.gov/sites/fta.dot.gov/files/FTA_Report_No._0021.pdf

I'm still skeptical of how valid this is in practical reality. The report is from 2012, and if side-facing seats are unsafe, the TTC and whoever builds their vehicles certainly seem to have ignored any such recommendation.
Given that there is no less than 500,000's plus buses in service daily worldwide, every manufacture must know something that report doesn't know for not making the changes. Supplier will make changes as requested at an extra cost for anyone who wants a change from the standard design.

TTC use Orion that will be gone in the next few years with Nova Bus replacing Orion as well NFI. NFI may replace the Nova Bus if the plan to sell it and service Quebec only happens. The US has Gilles as a 2nd supplier and BYD being a 3rd one. Europe has far more suppliers than NA with a number being bought up by larger companies.

NFI is the main player in NA now
 
July 11 to Sept 19, Route 26 is on Detour from Duke of York To Robert Speck with Burnhamthorpe Intersection Close to Traffic At Hurontario St for Guideway construction.

ML notice shows nothing for the 26 other than traffic using Central Parkway

Notices sent out by ML as well signs up on Hurontario for closure with nothing on service changes yet.

Lets see what planning has come up for this detour as well what the headway will be,

This also effects the 126 starting in Sept.
 
Looking forward to see if the new 126 will improve trip times to islington/kipling station. Currently for me (near creditview/burnhamthorpe), its often faster to take the 9 to city center transit terminal and transfer to 109 or Go bus 29.

Having a fast one seat trip down burnhamthorpe would be great but i wonder how much time this “express” would really shave off compared to 26.
 
Looking forward to see if the new 126 will improve trip times to islington/kipling station. Currently for me (near creditview/burnhamthorpe), its often faster to take the 9 to city center transit terminal and transfer to 109 or Go bus 29.

Having a fast one seat trip down burnhamthorpe would be great but i wonder how much time this “express” would really shave off compared to 26.
At this point, I don't know if the 126 will connect to CCTT. Don't know where you are coming from and expect it will not save you any time at all base on your info.

On another note, I see management has finally has taken my recommendation using White LED Display than the current two colours. First saw the white display in Norfolk VA in 2014 and was impress with it for for day and night display. Since then, seen numerous systems both in the US and Europe moved to the white display as well Hamilton and Waterloo systems

For express buses, they can change the route number to a different colour as long as it meet visible impaired standards
 
Last edited:
Oakville and Mississauga should work together to expand the Mississauga transitway westward to Trafalgar/ 407 park & ride. This would give Oakville residents easier access to Square One.

Mississauga should also look at expanding the Transitway north alongside the 410 till it reaches the 407. Put a stop at Courtney Park. This extension would be beneficial for GO buses as they wouldn't have to merge onto the 403 inorder to get onto the 407.
 
Oakville and Mississauga should work together to expand the Mississauga transitway westward to Trafalgar/ 407 park & ride. This would give Oakville residents easier access to Square One.

Mississauga should also look at expanding the Transitway north alongside the 410 till it reaches the 407. Put a stop at Courtney Park. This extension would be beneficial for GO buses as they wouldn't have to merge onto the 403 inorder to get onto the 407.
Any expansion of the Transitway will be done by Metrolinx since its a GO Thing in the first place. Mississauga was responsible for the section from CCTT to Dixie Rd with Metrolinx doing the other 2 extension. The missing section was a combination of Mississauga and Metrolinx with Mississauga not having the funds to do it.
 
Not sure which channel to post this in, but new crayons:


View attachment 584687
Dundas BRT Thread

Lots of issues need to be address first by council first before asking staff to do a report on the conversion. It will generate more development fast than a BRT with a higher return on the dollars invested in the LRT.

The LRT will save a lot of money on the operation side as you only need 1 driver to operate 2-3 LRV while maintaining the same headway as 1 LRV.

If the Dundas LRT happens and interline with Hurontario LRT, you close the intersection to all east-west traffic and northbound traffic will be using a southbound lane to tear out the new trackwork to built the T connection. It well shut down the LRT line to Port Credit for many months and does Mississauga have the buses to replace the LRT service until it can run again.
 
According to a notices, all 2300 buses will have white display starting Aug 5 as well the 82 24 00buses that will start to arrive this month until March 2025

It doesn't state what is to happen for the 1000-2200 and expect the same will happen with 700-800 not being done since they are past their retirement date already with the 900 schedule to be retire after all the 2400 are here

The 1000 are due to retire in 2026 with the hybrids hanging around a few more years due to cost to replace them and not all of the blue ones still haven't been paint orange yet.
 

Back
Top