Don't mean to be rude, but I think you're on the wrong Flexity thread.4404 was off loaded Friday after been shipped to Quebec on October 29, 2018. That 501 days off site and they must built a replacement for it for that length of time. If it takes as long as 4406 to reenter service, it will be almost 2 years out of service.
4409 is on its way to Quebec as of Friday.
4406 back out on the service track.
4405 GPS is all over the place.
4403 was back out testing Tues and Wed this week and that now 6 days of testing.