T3G
Senior Member
I am loathe to defend Metrolinx as I find their methods of doing just about anything deeply detestable, but why is their picking of a vehicle that was already in use a problem? Isn't that the advantage of building LRTs to standard gauge and voltage ratings, that they can grab something off the shelf and have it delivered in a reasonable timeframe, rather than having to specially design a vehicle that suits their needs as the TTC did?