Nov 15th:
Kind of looks like a light fixture that has dead bugs trapped inside.
Nov 15th:
TOareafan:
While it might be amazing from our perspective (besides the fact that the project is long overdue), it's really not that big deal at an international (or even North American, if you include NYC) level - the project (at a 1B or so) is downright miserly, especially considering the usage we're talking about.
AoD
What do you mean? We are getting a huge amount form $1 billion.. 2nd platform, new path connection, an entire new shopping level, 2 new concourses, etc, etc, etc. the amount of stuff we are getting is insane, and it will look about as great as you can reasonably expect a 90 year old station to be.
Though how would you stack this project up against the £500 million restoration of King's Cross in London?
Union will still look like Union. King's Cross is an entirely different looking station from the outside.
From a preservation point of view, Union is a much better project.
Is the glass roof not going to go right up to the building?
£550 million was just for the mainline trainshed and station at King's Cross. They also renovated the adjoining St. Pancras station at the same time, which was another £800 million. I don't know how much total has been spent on the King's Cross St. Pancras tube station, and I'm not sure if the two new underground platforms for the St. Pancras are included in that or not, as I think that was part of the Thameslink budget, not the St. Pancras £800 million. When all is said and done, and you convert to 2013$ it must be well over $2 billion - more double what is being spent at Union.Though how would you stack this project up against the £500 million restoration of King's Cross in London?
£550 million was just for the mainline trainshed and station at King's Cross. They also renovated the adjoining St. Pancras station at the same time, which was another £800 million. I don't know how much total has been spent on the King's Cross St. Pancras tube station, and I'm not sure if the two new underground platforms for the St. Pancras are included in that or not, as I think that was part of the Thameslink budget, not the St. Pancras £800 million. When all is said and done, and you convert to 2013$ it must be well over $2 billion - more double what is being spent at Union.
Again, it is not a competition, but your comment made me think out loud about what the total cost of the multiple projects are at Union?
Shed....second subway platform...new concourse and retail renovation.....nw path extension? It's all amazing stuff...and coming from different budgets/pockets...but I would have thought the total was beyond $1B....no?
Ya, that's what I thought, but wasn't sure. Thanks for the answer.Not quite. Referencing this:
All of the old roof that's to be totally removed is now gone, and four walls of the glass box will go around the complete periphery of that hole. The remaining space between there and the south wall of the station building proper (where the top decking of the roof has been removed but there are still beams) will have its decking put back and restored to its historical condition.
However, the top frosted glass roof structure has significant overhang beyond the actual glass box, so that will actually stick out over the restored old roof and head much closer to the station building proper. I don't know if we've seen a rendering that properly illustrates how close it will get.
TOareafan:
At this point, probably a bit beyond 1B - just off the cuff:
Station revitalization: ~800M
Union Station 2nd Platform: ~150M
Trainshed: ~250M
Western PATH: ~ 60M
So conservatively, we are looking at 1.25B.
AoD