The new Kitchener Line schedule still isn't on the website yet, which is unsurprising given the change was sprung on GO by politicians outside of the normal planning cycle, to fix an issue most likely caused by politicians springing half-baked ideas on GO outside of the planning cycle.
Anyway, if the 16:50 train is reinstated on its previous schedule, there will be reliability problems because the new 16:35 train is literally in its way. The express train is supposed to be 12 minutes faster than the local, which means that if it departs 15 minutes later, it will arrive at Bramalea only 3 minutes behind. At which point even the slightest delay to the 16:35 will cascade onto the 16:50. Ideally the trains should be spread further apart if there are slots available to do so in the USRC, perhaps shifting the 16:35 to 16:30.
View attachment 172961
The schedule is loaded into both the GO Transit and Triplinx website, if you select dates after next week. for example - https://www.triplinx.ca/en/route-sc.../1?Date=2/19/2019&Hour=3&Minute=0&Meridian=PM
Not surprisingly, the 4:35 pm ,moves to 4:32 and terminates at Bramalea. In other changes, the 4:04 pm will leave at 4:13 but run express to Etobicoke North and the 5:02 will (not surprisingly) be shortened to Georgetown.
Unfortunately, there doesn't seem to be any extra run of that Bramalea terminating train after 5:13 - it would have been a useful return back to Union replacing some bus services.