nfitz
Superstar
It was discussed and shown in the pre-Ontario Line Metrolinx presentation to the City, along with the two additional tunnels. https://www.toronto.ca/legdocs/mmis/2018/ep/bgrd/backgroundfile-112265.pdfI didnt know there was work for a 5th track... but im not sure what the point is.
That's why they initially extended the tunnel north from the old exit in 2017 - but then everything stopped and then there was the sudden Ontario Line plans, and the tunnel didn't open until 2022. They regraded the 5th track area back in 2017 as well.
January 2018 Metrolinx presentation
September 2017