innsertnamehere
Superstar
I believe the previous de-scoping was the elimination of the transit station building, but this is the first I've heard of the south parking lot being eliminated. The Metrolinx website on the station states that it will add only 150 parking spaces, so that seems to indicate the south lot was cut a while ago as well however.I read the document as simply clarifying the scope of the previous cutback.
The station was probably oversize, per previous ML habit, but the description of the track work is the telling piece. There won’t be much service if the new track isn’t added. EDIT: The inference is that CN will (eventually) deliver two new tracks, so it’s just the station itself that is being descoped.
- Paul
My interpretation of that procurement is that CN will install the two new tracks immediately following the completion of the GO station. So not cut, just not in the contractors scope.