north-of-anything
Active Member
Pretty much every line that can be used is already in use. The other rail lines we have are mostly ones that are already used for freight, like the lines that lead to Bolton and Orangeville. Peterborough would be better served with VIA, as most of the land in between there and Toronto is agricultural or otherwise protected.I have gone through this business case but it doesn't talk about new lines. It's more about expansion of existing lines.
What I am interested in is potentially how many new GO lines can we have (even if 100 years later) using the current rail track infrastructure or ROW in case we ever need to.
The only potential I can see for expansion would be the Missing Link along the 407 right of way, but that would be to shift freight traffic off of the Milton Line, and that project is controversial because it would require CP and CN to share or something.