lol shows how misguided LRT construction is, at least for the variant Toronto likes to build.
This is key. After my 8km walk on the weekend, I boarded the Spadina LRT NB to Line 2.
The wait time for the vehicle was brief; but the amount of time in-transit was barely ahead of walking speed.
We stopped at every single traffic light without fail, and then every single stop on the far side of the exact same light.
Completely and utterly ridiculous.
We need proper transit priority; fewer traffic lights, no delays for left-turning cars, and fewer stops.
Proper LRT is a fine idea, but if we're not going to build it properly, we should just stop.
The money for this project would go much further building dedicated bus infrastructure throughout Scarborough.
LOL, that would imply that we would build that properly. I'm not sure we should accept that as a given.
Spend the money on road widenings
Absolutely not. Dedicated bus lanes sure, but take existing traffic lanes and repurpose them.
Hell a lot of spots probably wouldn't even need real road widenings and could just have curbside lane conversions with strategic lane additions at key intersections, particularly for north-south streets which are generally far over capacity.
Ummm, here's the problem, those surplus lanes on Bellamy, and Brimley etc etc. are due to become Cycle Tracks; there would not be room for both cycle tracks and dedicated bus lanes w/o removing the boulevards and trees.
I tend to think repurposing would mostly be on the six-lane roads.