News   Mar 04, 2026
 171     0 
News   Mar 04, 2026
 373     0 
News   Mar 03, 2026
 1.5K     6 

Eastern Avenue Bridge/DVP Interchange

Hallelujah. I don't get why the city is so inconsistent with the barriers.

I thought we were going to end up with something useless like this:

View attachment 699913
This one is the standard MTO barrier. The other is the City Toronto barrier (although normally aluminum colour). The MTO barrier is closer to the real crash tested barrier that is supposed to be used (i.e. required by Code). There is a weasel clause in the Code that allows minor variations, which different owners interpret in different ways.
 
FYI: All that work that was being down along the street on the east side of the bridge is now clear. Much easier to get to, and across, the bridge now.

20251220_121633.jpg


20251220_121637.jpg
 
FYI: All that work that was being down along the street on the east side of the bridge is now clear. Much easier to get to, and across, the bridge now.

View attachment 704138

View attachment 704139
Yes, the City watermain has been replaced. Can someone remind me, has it been decided to regularise (make more of a 90 degree turn) the DVP access ramp here as part of the landform construction??
 
Yes, the City watermain has been replaced. Can someone remind me, has it been decided to regularise (make more of a 90 degree turn) the DVP access ramp here as part of the landform construction??
 
why is this work needed? Is this part of larger scope of things
Probably because the bridges are reaching the end of their design lifetimes and need to be replaced. However, I do look forward to the possibility of finally seeing the Richmond-Adelaide cycle tracks extended across the Don, though part of that would involve a future phase.
 
why is this work needed? Is this part of larger scope of things
If you look back at older photos in this thread you can see that when they removed the asphalt they needed to also remove LOTS of deteriorated concrete and there were lots of paces there were large holes needed to get totally new concrete - the 'bents' also needed attention.. The bridges are old and needed major repair (and higher walls to prevent vehicles 'jumping them".
 

Back
Top