News   Apr 24, 2026
 267     0 
News   Apr 24, 2026
 767     0 
News   Apr 24, 2026
 916     3 

Eastern Avenue Bridge/DVP Interchange

Is there still a plan to realign the DVP on ramp into a T-intersection?

Yes, although I believe it is part of the Broadview and Eastern Flood Protection (Phase 1) Project, being undertaken by the City, Waterfront Toronto, and the TRCA.

I can't immediately find details, but here's a City report that mentions the project: https://www.toronto.ca/legdocs/mmis/2022/ie/bgrd/backgroundfile-227973.pdf

Here is a slideshow of the options and preferred design: https://www.toronto.ca/wp-content/uploads/2023/12/95fb-Appendix-A-pages-58-144.pdf

Long story short, the preferred design looks like this:

1777057038515.png
 

Back
Top