How so? We are adding the DRL to provide extra capacity to accomodate riders from the north. Some upgrades could be required. But going back to the original point. How would upgrades not be required at the interchanges? Were the line to run down King or Queen, we would be creating 2 busy interchanges. Upgrades could well be required. However, all that'll only come out in the EA.
That's actually what makes Richmond-Adelaide so convenient. Although not all, lots of the properties along those two either face the perpendicular streets, or are the "backsides" of the buildings whose fronts actually face Queen or King. Richmond and Adelaide being semi-highway like in nature because of their 4-lane-one-way and DVP-connecting characteristics, make for a bit of a less-lively corridor within downtown (they're not pedestrian friendly streets), and don't have any transit routes on them besides peak-hour only express buses. At the same time, they're right beside two of the liveliest corridors in downtown and two of the busiest transit routes, too.
Surely this is a contradiction for you. Here, you've argued all along that we should minimize the amount people have to walk and build subways only to replace existing heavy demand corridors, than you assert we should build the subway half a block away simply to reduce a year or two of inconvenience.
Disruptions in these corridors would be far less detrimental than the same disruptions on King and Queen proper, no contest. This is similar to how parts of Bloor-Danforth were built... when not expropriating properties by the hundreds, Bloor-Danforth runs under side streets north of Bloor/Danforth propoer, avoiding the detrimental impacts to businesses along the corridor itself during construction.
But Yonge, runs on well Yonge St. and Sheppard on Sheppard. And none of those have suffered long term consequences from construction.
It's critically important that the Queen and King cars be allowed to run during construction. Having them shutdown for construction of stations is not an option.
I would dispute that it's absolutely critical. As long as the blocks are somewhat accessible, they'll survive without cars. They might have bad balance sheets for a year but they'll survive. Moreover, since most of their apparent patrons are transit users on a high demand corridor it's unlikely that they would see demand drop significantly. And hey, we can always avoid disrupting the whole area by just not building a subway there at all!
You're assuming the businesses survive the construction... that's not always a given, and is the big worry that most along the corridor have. Pedestrians tend to avoid construction just like drivers do, when they have a choice.
I am skeptical, folks are going to stop frequenting bars on Queen Street altogether because of construction or that major corporations will suddenly move entire office towers worth of staff because of construction They'll survive. Aside from which, this can't be an acceptable argument against construction. Wherever you plonk down the line, there's going to be disruption. Think about the disruption on Front!
Ultimately this all comes down to the numbers. And like I said we'll all have to wait and see. This is why I haven't voted for a preferred alignment. I will once I start seeing some information. As it stands, I lean towards Front/Wellington because of the all the development that is to come. I don't buy the argument that we should not service new dense neighbourhoods with subways just to service corridors that have maxed out. And I do think that there's more commercial development south of King which would rule out Queen for me (that's why I like Whoaccio's Wellington alignment). Moreover, building a subway further south leaves room to build a Queen subway in the future. The more the DRL moves north the less potency our argument will have for Queen getting its own subway later.
Anyway, we'll just have to wait for more numbers.