drum118
Superstar
Sewer lines were not touch, but drains were installed between the rails of each tracks. These drains where place every few 100's feet.
New manholes were installed also.
There is not a real crown in the road anymore as the concrete between the tracks as well the 18 inches on the outside are flush.
When they pour the concrete for the traffic lanes, it was flush also.
New manholes were installed also.
There is not a real crown in the road anymore as the concrete between the tracks as well the 18 inches on the outside are flush.
When they pour the concrete for the traffic lanes, it was flush also.